I am an ardent believer in it, given how many times it has saved our assets at work, often to the point of annoying people. That said, I usually end up being right for insisting on more time and/or data, so it’s all good.
However, my spoonerific brain always gets this twisted to “measure once, cut twice”.
I unknowingly wrote this once in a comment about asking for more metrics during a design review.
My colleague (the author of said design document) replied with the relevant metrics and a comment saying “measure never, cut forever”. :D
measure twice
cut once
hmm. I prefer to live by “I’ve cut it three times and it’s still too short”
Beats “cut it 3 times and it’s still too short” as my uncle said to me too many times… Along with “you hammer like old people fuck”
Measure three times, cut zero times
taps head
Measure once
Cut
oncetwiceMeasure again
Cut another time
I am an ardent believer in it, given how many times it has saved our assets at work, often to the point of annoying people. That said, I usually end up being right for insisting on more time and/or data, so it’s all good.
However, my spoonerific brain always gets this twisted to “measure once, cut twice”.
I unknowingly wrote this once in a comment about asking for more metrics during a design review.
My colleague (the author of said design document) replied with the relevant metrics and a comment saying “measure never, cut forever”. :D
Im stealing that xD that’s a good one
Indeed it is. :-)
Also, your comment made me realise that I mistyped asses in my original comment!
Going to leave it there for the sweet sweet irony. :D